Areas · Bristol & Gloucestershire

Commercial solar panels in Bristol & Gloucestershire.

We fit solar panels across Bristol and Gloucestershire from our base in Weston-super-Mare, and work nationwide. Our published projects here are a 193 kW public-sector roof in Gloucester and 115 kW on a warehouse roof at Avonmouth Docks.

Aerial view of the completed 193 kW solar installation across the Compass House rooftop in Gloucester
193 kW across five roof aspects on a live 24/7 public-sector site — Compass House, Gloucester.
Installs mapped here
2
Miles from our base
13–44
Services delivered here
3
Verifiable local data points
7

Bristol & Gloucestershire on the map

Every pin is a job we’ve installed.

Dock and public-sector roofs. Pick a pin for the details.

All areas
Irish SeaNorth SeaEnglish ChannelBristol ChannelCeltic Sea 51°N52°N53°N54°N 5°W4°W3°W2°W1°W BathTauntonExeterPlymouthTruroCardiffSwanseaOxfordWorcesterHerefordCoventrySouthamptonPortsmouthBrightonReadingCambridgeNorwichNottinghamLeicesterManchesterLiverpoolLeedsSheffieldYorkNewcastle
  • Jobs we’ve installed
  • Our base
  • Towns and cities
  • Pick a pin for the detailsTap a pin for the details

Nationwide service across the UK. Wherever your home or site is, it starts with a free design.

Get a free design

Distance from our base

Where we’ve worked in Bristol & Gloucestershire.

  1. Avonmouth, Bristol 13 miles

    115 kW commercial rooftop installation on the Caple building at Avonmouth Docks — rooftop mounting, DC cabling and tray/containment across the warehouse roof.

  2. Gloucester 44 miles

    193 kW of rooftop solar delivered across five separate roof aspects at Compass House — a live, 24/7 operational public-sector site.

Local context

  • Network operator

    The Energy Networks Association’s postcode finder returns National Grid Electricity Distribution for both job locations: Avonmouth in its South West England licence area and Gloucester in its West Midlands area. Some properties are on an independent network (IDNO) instead.

    Energy Networks Association — Who’s my electricity network operator?
  • G98 and G99

    Generation connected to the distribution network has to meet ENA’s G98 or G99 requirements, with compliance demonstrable when it’s commissioned. Completed forms go to the local network operator, not to ENA.

    Energy Networks Association — Connecting generation
  • Lendology CIC in Bristol

    Lendology CIC offers council-funded loans in Bristol, exclusively for homeowners or private landlords, for home improvements and renewables such as solar panels or battery storage. We don’t arrange, broker or advise on credit.

    Lendology CIC — Bristol City Council
  • Warm Homes: Local Grant

    On the government’s list of local authorities funded for the Warm Homes: Local Grant, Bristol leads a consortium, and Gloucester and Cheltenham are part of a consortium led by Stroud. Your council can confirm whether its scheme is open to you.

    GOV.UK — Warm Homes: Local Grant successful local authorities (updated 2 July 2026)

Solar in Bristol & Gloucestershire

What solar panels make in Bristol and Gloucester.

Both of our jobs here are big commercial roofs, so the figure that matters is generation per kilowatt across a whole year. PVGIS puts it at about 1,002 kWh at Avonmouth and 969 in Gloucester, the docks end of the region out-generating the city up the Severn by around 3%.

For a business, the shape of the year matters as much as the total: from May to July each south-facing kilowatt makes around 120 kWh a month, against 34 in December — which is why a commercial design starts from the site’s half-hourly load, not just the roof. The two jobs even sit on different parts of the grid: the ENA’s finder puts Avonmouth in National Grid Electricity Distribution’s South West licence area and Gloucester in its West Midlands one.

1,002kWh

a year from one south-facing kilowatt at Avonmouth Docks, month by month

  1. January: 39 kWh
  2. February: 53 kWh
  3. March: 86 kWh
  4. April: 114 kWh
  5. May: 123 kWh
  6. June: 120 kWh
  7. July: 122 kWh
  8. August: 108 kWh
  9. September: 93 kWh
  10. October: 67 kWh
  11. November: 44 kWh
  12. December: 34 kWh
  • Avonmouth, Bristol1,002 kWh
  • Gloucester969 kWh
PVGIS 5.3, EU Joint Research Centre (PVGIS-SARAH3 satellite weather, 2005–2023): one kilowatt of crystalline panels facing due south at a 35° pitch, with 14% system losses. Split half east, half west at the same pitch: 793 kWh.

Data last reviewed: October 2026

Photographed jobs

Our installs in Bristol & Gloucestershire.

All projects
Case studies 10 projects, from single homes to public-sector rooftops. See every project

Bristol & Gloucestershire installs

A custody suite and a dockside warehouse.

Both of our commercial case studies here were delivered on live, operational sites. Compass House in Gloucester is a 24/7 operational custody site: our in-house team delivered 193 kW across five separate roof aspects, coordinating multiple work fronts across the building’s varied roof layout and keeping module alignment, containment routes and site safety consistent throughout.

At Avonmouth Docks, the Caple building took 115 kW across a standing-seam warehouse roof, with our in-house team delivering the rooftop mounting, DC cabling and tray/containment package on a live industrial dockside site.

115 kW rooftop solar PV array on the Caple building at Avonmouth Docks, Bristol
115 kW across a metal warehouse roof — the Caple building, Avonmouth Docks.

How we work in Bristol & Gloucestershire

Site data for business roofs, a survey for homes.

We work nationwide across the UK from our base in Weston-super-Mare, as one contractor accountable from feasibility to commissioning. For a business site, send us your roof plan or half-hourly data and we’ll model generation against your actual load profile, then come back with capacity, cost, payback and the funding routes available.

  1. Multi-aspect string design

    Roofs that face several ways, like the five aspects at Compass House, get a string design to match.

  2. Structural & wind-load assessment

    Commercial roofs are engineered around roof condition, loading and access.

  3. A one-hour home survey

    For solar and batteries at home, a visit to check the roof, loft, consumer unit and cable routes.

Services

What we’ve delivered in Bristol & Gloucestershire.

Checkable facts

7 verifiable local data points on this page.

Every point below traces to one of our own published jobs, a review location or a straight-line distance from our base.

  1. 193 kW array engineered across five separate roof aspects

    Our published job · Project page: Compass House Custody Suite, Gloucester
  2. Delivered on a live 24/7 operational custody site with minimal disruption

    Our published job · Project page: Compass House Custody Suite, Gloucester
  3. 115 kW of PV across a standing-seam warehouse roof

    Our published job · Project page: Caple building — Avonmouth Docks
  4. DC cabling and tray/containment routed back to the inverter position

    Our published job · Project page: Caple building — Avonmouth Docks
  5. Industrial dockside site delivered on programme

    Our published job · Project page: Caple building — Avonmouth Docks
  6. Avonmouth, Bristol is 13 miles from our base in Weston-super-Mare (straight-line distance).

    Distance · Straight-line distance from OS Open Names coordinates
  7. Gloucester is 44 miles from our base in Weston-super-Mare (straight-line distance).

    Distance · Straight-line distance from OS Open Names coordinates

FAQs

Working in Bristol & Gloucestershire: your questions.

Straight answers about coverage, surveys and installs.

All FAQs

Send photos of your roof, fuse box or bill on WhatsApp

Message on WhatsApp

Yes — we work nationwide across the UK from our base in Weston-super-Mare. Our published projects here are at Avonmouth Docks in Bristol and in Gloucester.

There are two: the Caple building at Avonmouth Docks (115 kW on a standing-seam warehouse roof) and Compass House in Gloucester (193 kW across five roof aspects on a live 24/7 site). Each has its own project page with photos.

The Energy Networks Association’s postcode finder returns National Grid Electricity Distribution for Avonmouth and Gloucester, though some properties are on an independent network. For business sites we handle the G99 and DNO applications end to end; for homes, DNO notification is part of our handover.

For solar and batteries at home, it’s a one-hour visit to check the roof, loft, consumer unit and cable routes. For a business site, start by sending us your roof plan or half-hourly data.

On PVGIS, roughly 1,002 kWh a year for every kilowatt of panels on a south-facing roof at Avonmouth, and around 969 in Gloucester. Most roofs aren’t due south, so we model yours — direction, pitch, shading and, for a business, the half-hourly load — before we quote.

Usually not a full application. Solar on a non-domestic roof in England is permitted development under Class J; above 50 kW the council’s prior approval of the design and appearance is needed first, which in the city is Bristol City Council. A listed building, or a roof within its curtilage, needs a full planning application.

Not at present. In England, plant used for onsite renewable generation and the storage that goes with it is left out of business-rates valuation until the end of March 2035, so a rooftop array on a Gloucester or Bristol business doesn’t add to its rateable value while that rule stands.

Other areas

Nationwide, from Weston-super-Mare.

All areas

Ready when you are

Ready to go 100% renewable?

Thinking about solar panels in Bristol or Gloucestershire? Tell us about your property, or send us your roof plan, and we’ll design a system around your roof, your usage and your budget — with no obligation.

Office hours
Mon–Fri, 8am–6pm
Head office
Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
  1. 1Your property
  2. 2About the project
  3. 3Your details

Free Solar Assessment

For free advice, call 07301 468735.

Enter your postcode.

Installation type

Choose one option.

About the project

A little more detail helps us design the right system first time.

Roof or site type
When are you looking to install?

Your details

Last step — then we’ll be in touch.

Enter your name.

Enter a phone number.

Enter a valid email address.

Thanks, we’ve received your details.

Our team replies within 24 hours to discuss your project and arrange your free design.