Solar farms · O&M

Solar farm operations and maintenance, planned and reactive.

Planned and reactive maintenance across operational portfolios, with reporting the asset manager can act on.

Compound Point of connection
Illustration: a ground-mount solar farm layout, shown in full — not a specific site.
Preventative visits on a schedule
On plan
Diagnosed, repaired, spares held
Faults
Vegetation kept off the array
Site
Reporting for the asset manager
Act on it

What’s included

Maintenance and reporting for operational solar farms.

Planned visits, fault response and vegetation control on an operational site — reported in terms an asset manager can use.

  • Scheduled preventative maintenance

    Visits on a set schedule to inspect the plant and its electrical systems.

  • Fault response & spares

    Faults diagnosed and repaired, with an agreed list of spares so common failures don’t wait on deliveries.

  • Vegetation & site management

    Grass and scrub kept off the modules and away from the structures, and the site kept accessible for maintenance.

  • Performance reporting

    Generation, availability and incidents reported so the asset manager can see what the plant did and why.

  • Across operational portfolios

    The same maintenance approach and reporting for one site or several.

Planned and reactive

Routine visits, then faults traced to the cause.

Planned maintenance repeats the same checks on a schedule — modules, structures, cabling, inverters — so a change stands out against the last visit. String readings are compared with their commissioning results, inverter fault logs are read for early warnings, and thermal surveys are done on a sunny day, when anything running hot shows up.

Reactive work starts with diagnosis on site. A fault is traced to its cause, made safe or temporarily repaired if the full fix needs parts, then properly repaired and tested — ideally at night or in low light, when taking part of the plant offline costs the least generation.

A step: part of the string held backVOLTAGE →CURRENT →Expected for the conditionsMeasuredA string’s measured curve against the curve it should give for the sunlight at the time
Illustration: a string read against the curve it should give — not a specific site.
  1. Diagnose

    Find the cause before replacing anything.

  2. Make safe

    Temporary repair while parts are sourced.

  3. Repair

    The full fix, timed to cost the least generation.

  4. Record

    Each fault logged against the equipment it affected.

Vegetation and site management

A little shade costs more than it looks.

Shade costs more output than its size suggests, because modules are wired in series and a small shaded patch drags down more than its own share. Left alone, shading can also create hot spots that damage modules over time, and woody growth pushing into the rows can damage modules and structures directly.

How vegetation is kept down depends on the site: mowing and strimming, grazing sheep, or seeding low-growing plants. Each has trade-offs — sheep will not touch thistles or woody plants, and mowing close to modules needs care — but the aim is the same: clear modules, stable ground and safe access.

  1. Shade

    Kept off the modules.

  2. Growth

    Woody plants kept out of the rows.

  3. Ground

    Cover managed so the soil stays put.

  4. Access

    Rows and tracks clear for maintenance.

Working with us

One contractor, directly employed teams.

  • Self-delivered labour

    Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.

  • Access in-house

    Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.

  • Documented to audit standard

    RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.

  • Mobilise quickly

    Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.

How a package runs

Tender pack to energisation.

Take one package or the lot — self-delivered, and documented as the work proceeds.

  1. 01
    Enquiry

    Tell us about the scheme

    We price the packages you need against your programme and scope.

  2. 02
    Week one

    Mobilise

    Welfare, compounds, access and inductions set up so the site works from week one.

  3. 03
    As we go

    Deliver & document

    Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.

  4. 04
    Handover

    Energise & hand over

    Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.

Performance reporting

Numbers that separate weather from faults.

A dull month and a failing string can produce the same drop in output. Reporting that reads generation against the sunlight the site actually received — its performance ratio — tells the two apart, so the asset manager can see when underperformance is down to the plant rather than the weather.

Alongside it sit availability — how much of the time the plant could generate — the main incidents and their effect on production, the spares used and the planned work completed. A failure traced back to a particular make, model or serial number also gives a warranty claim something to stand on.

Ratio drops:look for a faultGenerationGeneration against sunlight receivedOutput follows the weather; the ratio holds steady until something needs attention
Illustration: generation read against the sunlight received — not a specific site.
  1. Performance ratio

    Output against the sunlight received.

  2. Availability

    Time the plant was able to generate.

  3. Incidents

    What went wrong and what it cost.

  4. Spares & tasks

    Parts used and planned work done.

References

Site references and method statements, on request.

We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.

FAQs

O&M: your questions.

Straight answers from the team who quotes and installs.

All FAQs

Email a tender pack, drawings or programme

Email the team

Yes. O&M can follow testing and commissioning on a new scheme, starting from its evidence pack, or cover planned and reactive maintenance across an operational portfolio on its own.

Yes. Vegetation and site management are part of the package — keeping growth off the modules and out of the rows, with the method chosen to suit the site.

Yes. O&M covers operational portfolios as well as single sites, so several solar farms can share one maintenance and reporting approach.

Ready when you are

Ready to go 100% renewable?

Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.

Office hours
Mon–Fri, 8am–6pm
Head office
Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ

Solar farm packages, nationwide from Weston-super-Mare

  1. 1Your site
  2. 2About the project
  3. 3Your details

Tender enquiry

Tell us about the scheme and the packages you need. Take one package or the lot.

Enter your postcode.

Packages

Choose one option.

About the project

A little more detail helps us design the right system first time.

Roof or site type
When are you looking to install?

Your details

Last step — then we’ll be in touch.

Enter your name.

Enter a phone number.

Enter a valid email address.

Thanks, we’ve received your details.

Our team replies within 24 hours to discuss the scheme.