Solar farms · DC installation

Solar farm DC installation, string by string.

String wiring, harnessing, combiner and inverter terminations built for 25-year service life.

Compound Point of connection
Illustration: a ground-mount solar farm layout with the DC strings highlighted — not a specific site.
Service life the DC install is built for
25-year
Crimping & continuity checks
MC4
Tested before handover
Strings
Terminations into combiners and inverters
DC

What’s included

Strings wired, terminated and tested.

The run from each module to the inverter — wired, harnessed, terminated and tested — built to be left alone for decades.

  • String wiring & cable management

    Strings wired to the string layout, with cable runs fixed along the structure rather than left hanging.

  • MC4 crimping & continuity checks

    Connectors crimped onto the cable with the tool made for them, mated to their matching half, then checked for continuity.

  • Combiner / inverter terminations

    String and harness cables terminated into combiner boxes and inverters to the equipment maker’s instructions, with polarity confirmed before connection.

  • String test records at handover

    Each string’s test results written up, so the DC side goes into commissioning with its own record.

  • Harnessing

    String and harness cables run back along the rows to the combiner or inverter, labelled so each string can be traced to its connection point.

Where DC faults start

Crimps, connectors and terminations decide the service life.

A 25-year service life is decided by connections made in the field. A poor crimp, a damp connector or two halves that don’t quite match can run warm for years before anyone notices — and connections made up on site carry more of that risk than ones made in a factory.

CrimpSealsLocking clipTwo matching halvesA crimped, sealed and locked field connection — made up in the dry, never pulled apart under load
Illustration: a crimped, sealed and locked connection — not a specific site.
  1. Crimp

    Made with the tool the connector maker specifies.

  2. Mate

    Only matching halves, clean and dry.

  3. Check

    Continuity confirmed on every string.

  4. Seal

    Enclosure entries made so water stays out.

String test records

What a string test record shows.

String test records are the DC package’s handover evidence: every string tested, and the results written down against its place in the layout. Once the plant is energised, those records become the baseline — a string that later reads differently can be compared with what it measured on the day it was connected.

String test recordSTRINGOPEN CIRCUITINSULATIONCHECKED
Illustration: a string test record, one row per string — not a specific site.
  1. Polarity

    Positive and negative the right way round before connection.

  2. Open-circuit voltage

    Shows wiring mistakes, such as a module missing from a string.

  3. Continuity

    Confirms each circuit is complete from end to end.

  4. Insulation resistance

    Shows damaged cable or moisture getting in.

Working with us

One contractor, directly employed teams.

  • Self-delivered labour

    Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.

  • Access in-house

    Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.

  • Documented to audit standard

    RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.

  • Mobilise quickly

    Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.

How a package runs

Tender pack to energisation.

Take one package or the lot — self-delivered, and documented as the work proceeds.

  1. 01
    Enquiry

    Tell us about the scheme

    We price the packages you need against your programme and scope.

  2. 02
    Week one

    Mobilise

    Welfare, compounds, access and inductions set up so the site works from week one.

  3. 03
    As we go

    Deliver & document

    Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.

  4. 04
    Handover

    Energise & hand over

    Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.

Interfaces and sequence

Live in daylight, connected last.

A solar module has no off switch: it produces voltage whenever light falls on it. DC work is sequenced with that in mind — connections are never pulled apart under load, and strings are isolated before anyone works on a connected circuit. Terminations into combiners and inverters come last, once the strings are wired and tested.

The DC package picks up where mechanical installation finishes, on tables that are built and recorded, and hands over to the LV / MV works and commissioning. Taking the packages either side of it removes a handover between contractors, and the DC records carry straight on into commissioning.

  1. From mechanical

    Finished tables, ready to wire.

  2. To LV / MV

    Terminated strings ready for the station connections.

  3. Into commissioning

    String test records carried forward.

References

Site references and method statements, on request.

We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.

FAQs

DC installation: your questions.

Straight answers from the team who quotes and installs.

All FAQs

Email a tender pack, drawings or programme

Email the team

Yes. DC installation can be taken on its own — we deliver full or partial scope on ground-mount schemes, working directly for developers, EPCs and principal contractors.

Strings wired, harnessed and terminated into combiners and inverters, with a test record for every string ready for commissioning.

It changes the order of work. Cable runs and harnessing can carry on, but connectors are only mated in the dry, so connection work is planned around the forecast.

Ready when you are

Ready to go 100% renewable?

Need solar farm DC installation? Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.

Office hours
Mon–Fri, 8am–6pm
Head office
Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ

Solar farm packages, nationwide from Weston-super-Mare

  1. 1Your site
  2. 2About the project
  3. 3Your details

Tender enquiry

Tell us about the scheme and the packages you need. Take one package or the lot.

Enter your postcode.

Packages

Choose one option.

About the project

A little more detail helps us design the right system first time.

Roof or site type
When are you looking to install?

Your details

Last step — then we’ll be in touch.

Enter your name.

Enter a phone number.

Enter a valid email address.

Thanks, we’ve received your details.

Our team replies within 24 hours to discuss the scheme.