Solar farms · DC installation
Solar farm DC installation, string by string.
String wiring, harnessing, combiner and inverter terminations built for 25-year service life.
- Service life the DC install is built for
- 25-year
- Crimping & continuity checks
- MC4
- Tested before handover
- Strings
- Terminations into combiners and inverters
- DC
What’s included
Strings wired, terminated and tested.
The run from each module to the inverter — wired, harnessed, terminated and tested — built to be left alone for decades.
-
String wiring & cable management
Strings wired to the string layout, with cable runs fixed along the structure rather than left hanging.
-
MC4 crimping & continuity checks
Connectors crimped onto the cable with the tool made for them, mated to their matching half, then checked for continuity.
-
Combiner / inverter terminations
String and harness cables terminated into combiner boxes and inverters to the equipment maker’s instructions, with polarity confirmed before connection.
-
String test records at handover
Each string’s test results written up, so the DC side goes into commissioning with its own record.
-
Harnessing
String and harness cables run back along the rows to the combiner or inverter, labelled so each string can be traced to its connection point.
Where DC faults start
Crimps, connectors and terminations decide the service life.
A 25-year service life is decided by connections made in the field. A poor crimp, a damp connector or two halves that don’t quite match can run warm for years before anyone notices — and connections made up on site carry more of that risk than ones made in a factory.
-
Crimp
Made with the tool the connector maker specifies.
-
Mate
Only matching halves, clean and dry.
-
Check
Continuity confirmed on every string.
-
Seal
Enclosure entries made so water stays out.
Full or partial scope
Where this package sits on a solar farm build.
Take one package or the lot — every package is self-delivered by directly employed teams.
- Solar farm Site mobilisation Welfare, compounds, access and inductions
- Solar farm Trenching & civils Cable routes, ducting and station bases
- Solar farm Mechanical installation Setting-out, structures and module install
- Solar farm DC installation String wiring, combiners and terminations
- Solar farm LV / MV works Inverter stations, MV cables and jointing
- Solar farm Testing & commissioning Energisation testing with an evidence pack
- Solar farm O&M Preventative maintenance and reporting
String test records
What a string test record shows.
String test records are the DC package’s handover evidence: every string tested, and the results written down against its place in the layout. Once the plant is energised, those records become the baseline — a string that later reads differently can be compared with what it measured on the day it was connected.
-
Polarity
Positive and negative the right way round before connection.
-
Open-circuit voltage
Shows wiring mistakes, such as a module missing from a string.
-
Continuity
Confirms each circuit is complete from end to end.
-
Insulation resistance
Shows damaged cable or moisture getting in.
Working with us
One contractor, directly employed teams.
-
Self-delivered labour
Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.
-
Access in-house
Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.
-
Documented to audit standard
RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.
-
Mobilise quickly
Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.
How a package runs
Tender pack to energisation.
Take one package or the lot — self-delivered, and documented as the work proceeds.
- 01 Enquiry
Tell us about the scheme
We price the packages you need against your programme and scope.
- 02 Week one
Mobilise
Welfare, compounds, access and inductions set up so the site works from week one.
- 03 As we go
Deliver & document
Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.
- 04 Handover
Energise & hand over
Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.
Interfaces and sequence
Live in daylight, connected last.
A solar module has no off switch: it produces voltage whenever light falls on it. DC work is sequenced with that in mind — connections are never pulled apart under load, and strings are isolated before anyone works on a connected circuit. Terminations into combiners and inverters come last, once the strings are wired and tested.
The DC package picks up where mechanical installation finishes, on tables that are built and recorded, and hands over to the LV / MV works and commissioning. Taking the packages either side of it removes a handover between contractors, and the DC records carry straight on into commissioning.
-
From mechanical
Finished tables, ready to wire.
-
To LV / MV
Terminated strings ready for the station connections.
-
Into commissioning
String test records carried forward.
References
Site references and method statements, on request.
We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.
FAQs
DC installation: your questions.
Straight answers from the team who quotes and installs.
All FAQsEmail a tender pack, drawings or programme
Email the teamYes. DC installation can be taken on its own — we deliver full or partial scope on ground-mount schemes, working directly for developers, EPCs and principal contractors.
Strings wired, harnessed and terminated into combiners and inverters, with a test record for every string ready for commissioning.
It changes the order of work. Cable runs and harnessing can carry on, but connectors are only mated in the dry, so connection work is planned around the forecast.
Ready when you are
Ready to go 100% renewable?
Need solar farm DC installation? Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.
- Office hours
- Mon–Fri, 8am–6pm
- Head office
- Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
- +44 7301 468735
Solar farm packages, nationwide from Weston-super-Mare
- 1Your site
- 2About the project
- 3Your details