Solar farms · Site mobilisation
Site mobilisation for ground-mount solar farms.
Everything needed to get a site working from week one — welfare, compounds, access and inductions.
- A site ready to work
- Week one
- Haul roads in and around site
- Access
- Tooling and lifting arranged
- Plant
- Inductions and permits
- RAMS
What’s included
Everything a site needs before the first pile.
Mobilisation turns a field into a working construction site: somewhere to eat and wash, a compound, roads that carry plant, and crews inducted before they start.
-
Welfare & site compound set-up
Welfare cabins, storage and laydown set up from the first day on site, however remote the field.
-
Haul roads & site access
Access from the public road and haul roads across the site, laid out so deliveries and plant can move without churning the field.
-
Plant, tooling & lifting
The plant and tools each package needs, with lifts planned before loads leave the ground.
-
Inductions, RAMS & permits
Every worker inducted to the site, risk assessments and method statements in place for the work, and permits issued before controlled work begins.
-
CDM-compliant documentation
Site paperwork prepared to fit the project’s health and safety arrangements from the day mobilisation starts.
Week one
Set up once, in the right order.
Mobilisation sets the conditions every other package depends on. Access comes first, because nothing else can arrive without it; then the compound and welfare, so crews have somewhere to eat, wash and shelter; then plant and tooling; and inductions before anyone starts work. Get that order wrong and every package that follows inherits the delay.
-
Access
Roads in before anything heavy arrives.
-
Compound
Welfare, storage and laydown in place.
-
Plant
Machines and tools for the first packages.
-
Inductions
Every crew briefed on the site before starting.
Full or partial scope
Where this package sits on a solar farm build.
Take one package or the lot — every package is self-delivered by directly employed teams.
- Solar farm Site mobilisation Welfare, compounds, access and inductions
- Solar farm Trenching & civils Cable routes, ducting and station bases
- Solar farm Mechanical installation Setting-out, structures and module install
- Solar farm DC installation String wiring, combiners and terminations
- Solar farm LV / MV works Inverter stations, MV cables and jointing
- Solar farm Testing & commissioning Energisation testing with an evidence pack
- Solar farm O&M Preventative maintenance and reporting
Remote sites
Fields don’t come with facilities.
Ground-mount schemes are usually in open fields, away from toilets, running water and hard roads. So welfare has to be self-contained and in place from the first day, access has to carry delivery lorries across farmland, and the compound has to give crews somewhere to store materials and keep dry between shifts.
-
Welfare
Self-contained, from day one.
-
Lorry access
Routes that carry deliveries across farmland.
-
Storage
Materials kept dry and out of the way.
Working with us
One contractor, directly employed teams.
-
Self-delivered labour
Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.
-
Access in-house
Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.
-
Documented to audit standard
RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.
-
Mobilise quickly
Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.
How a package runs
Tender pack to energisation.
Take one package or the lot — self-delivered, and documented as the work proceeds.
- 01 Enquiry
Tell us about the scheme
We price the packages you need against your programme and scope.
- 02 Week one
Mobilise
Welfare, compounds, access and inductions set up so the site works from week one.
- 03 As we go
Deliver & document
Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.
- 04 Handover
Energise & hand over
Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.
Phasing and weather
Mobilised in stages as the build moves.
On a large site one compound is not always enough. As the work moves across the site, welfare, laydown and access can move with it, so crews are not walking half a field to reach facilities. Haul roads keep to set routes, because plant driven across wet ground damages soil the field will need again after the build.
-
Stages
Facilities moved as the work progresses.
-
Set routes
Plant kept off open ground.
-
Weather
Wet spells planned for, not worked through.
References
Site references and method statements, on request.
We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.
FAQs
Site mobilisation: your questions.
Straight answers from the team who quotes and installs.
All FAQsEmail a tender pack, drawings or programme
Email the teamYes. Site mobilisation can be taken on its own, with welfare, compounds and access set up ready for whoever delivers the packages that follow.
Yes. Welfare and compound set-up are part of the package, self-contained where the site has no facilities of its own.
Site inductions, risk assessments, method statements and permits for the work, ready before crews start rather than assembled afterwards.
Ready when you are
Ready to go 100% renewable?
Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.
- Office hours
- Mon–Fri, 8am–6pm
- Head office
- Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
- +44 7301 468735
Solar farm packages, nationwide from Weston-super-Mare
- 1Your site
- 2About the project
- 3Your details