Areas · South West
Solar panels, batteries and EV charging in Somerset and the South West.
We’re based in Weston-super-Mare and work nationwide across the UK. Our published South West projects are homes in Bleadon, Weston-super-Mare and Watchet — solar panels, battery storage and an EV charger.

- Installs mapped here
- 3
- Miles from our base
- 3–22
- Services delivered here
- 3
- Verifiable local data points
- 15
South West on the map
Every pin is a job we’ve installed.
Our base, plus homes from Watchet to Bleadon. Pick a pin for the details.
- Jobs we’ve installed
- Our base
- Towns and cities
- Pick a pin for the detailsTap a pin for the details
South West
Our base, plus homes from Watchet to Bleadon.
- Shiplate, Bleadon 12 kW PV + 10 kWh Fox ESS
- Haywood Village all-black PV, Fox ESS battery + EV charger
- Watchet flats 31 × 3.6 kW PV with Tigo
Nationwide service across the UK. Wherever your home or site is, it starts with a free design.
Get a free designDistance from our base
Where we’ve worked in the South West.
- Haywood Village 3 miles
Neat full-width all-black PV array on a new-build pitched roof in Weston-super-Mare, paired with a Fox ESS hybrid inverter and battery — plus a tidy wall-mounted EV charger run from the same install.
- Shiplate, Bleadon 5 miles
Full-roof all-black PV array on a standing-seam metal roof, paired with a Fox ESS battery, AC/EPS isolators and three-string DC isolation.
- Watchet 22 miles
Thirty-one individual 3.6 kW solar PV systems installed across a block of flats — a domestic install delivered at commercial scale.
Local context
- Network operator
The Energy Networks Association’s postcode finder returns National Grid Electricity Distribution, in its South West England licence area, for Bleadon, Weston-super-Mare and Watchet. Some homes and businesses are on an independent network (IDNO) instead — the Distributor ID on your electricity bill helps identify yours.
Energy Networks Association — Who’s my electricity network operator? - G98 and G99
G98 and G99 are the Energy Networks Association’s requirements for connecting generation — battery storage included — to the distribution network. ENA doesn’t process the forms: they go to the local network operator where the system connects.
Energy Networks Association — Connecting generation - Warm Homes: Local Grant
Somerset, North Somerset (in a Bristol-led consortium) and Torbay (in a Devon-led consortium) are on the government’s list of local authorities funded for the Warm Homes: Local Grant. Your council can tell you whether its scheme is open and who qualifies.
GOV.UK — Warm Homes: Local Grant successful local authorities (updated 2 July 2026) - Planning
North Somerset Council is the planning authority for Weston-super-Mare, Bleadon and Haywood Village; Watchet is in Somerset Council’s area. The council’s Article 4 Directions page lists directions in Weston-super-Mare, including the Melrose and Grove Park, Birnbeck and Great Weston conservation areas, which take away some permitted development rights there.
North Somerset Council — Article 4 Directions
Solar in Somerset
What solar panels make in Somerset.
Our base is in Weston-super-Mare, and three of our published installs are in North Somerset and Somerset. On the EU’s PVGIS model, each south-facing kilowatt at the office makes about 1,030 kWh in an average year; Bleadon and Haywood Village land within a few kWh of that, and Watchet, out on the West Somerset coast, comes in at about 992.
The year is lopsided: June brings around 125 kWh per kilowatt and December only 32, so in winter a home battery does more of its work on a cheap overnight tariff than on sunshine. A roof that faces east and west isn’t a lost cause either — split across both slopes at the same pitch, that kilowatt still makes 813 kWh here, 79% of the south-facing figure, spread over the morning and evening instead of midday.
1,030kWh
a year from one south-facing kilowatt at our Weston-super-Mare office, month by month
- Weston-super-Mare (our base)1,030 kWh
- Haywood Village1,027 kWh
- Bleadon1,027 kWh
- Watchet992 kWh
Data last reviewed: October 2026
Photographed jobs
Our installs in the South West.
Domestic install — Haywood Village
Haywood Village, Weston-super-Mare · Private domestic
Fox ESS battery · EV charger
X31 — 31 flats, domestic PV at commercial scale
Watchet, Somerset · Private domestic (multi-site)
Tigo rapid shutdown · per-flat monitoring
South West installs
A metal roof, a new build and 31 flats.
Our published South West jobs are all homes. At Shiplate in Bleadon, North Somerset, a full-roof all-black array went onto a standing-seam metal roof with a 10 kWh Fox ESS battery, AC/EPS changeover and three-string DC isolation — fully labelled, with the PV schematic and shutdown procedure issued at handover. In Haywood Village, Weston-super-Mare, a new-build tiled roof took a full-width all-black array and a Fox ESS hybrid inverter and battery, with a wall-mounted EV charger installed as part of the same job.
In Watchet, thirty-one individual 3.6 kW systems went across one block of flats under the ECO4 scheme. Every flat has its own array with TIGO module-level rapid shutdown and monitoring, and scaffolding to all 31 units came through 100% Access Ltd.

How we work in the South West
A free design first, then a one-hour survey.
We’re based at Ebdon Road in Weston-super-Mare and work nationwide across the UK, so a home here follows the same route as anywhere else: a free design, a site survey, the install and handover. Where scaffolding is needed it comes through our sister company, 100% Access Ltd — as it did for all 31 flats in Watchet.
Most roof arrays on houses here go up under permitted development, without a planning application. Listed homes, flat roofs in conservation areas and streets under an Article 4 Direction are the exceptions, and our guide to planning permission for solar panels sets out the 2026 rules. For the panels themselves, see solar panel installation for homes.
-
Free design
Send us your address and bills — we model your roof, generation and savings at no cost.
-
Site survey
A one-hour visit to check the roof, loft, consumer unit and cable routes.
-
Installation
Most homes are completed in 1–2 days by our own engineers — no subcontractors.
-
Handover & aftercare
MCS certificate, DNO notification, app set-up and an optional maintenance plan.
What our customers say
What customers in the South West say.
Services
What we’ve delivered in the South West.
-
Solar panels · Homes
All-black panels designed around your roof
-
Battery storage · Homes
Keep daytime solar for the evening
-
EV charging · Homes
Smart chargers that use surplus solar
Checkable facts
15 verifiable local data points on this page.
Every point below traces to one of our own published jobs, a review location or a straight-line distance from our base.
-
12 kW all-black PV array on a standing-seam metal roof
Our published job · Project page: Domestic install — Shiplate, Bleadon -
10 kWh Fox ESS battery with AC/EPS changeover
Our published job · Project page: Domestic install — Shiplate, Bleadon -
PV schematic and shutdown procedure issued at handover
Our published job · Project page: Domestic install — Shiplate, Bleadon -
Full-width all-black array on a new-build tiled roof
Our published job · Project page: Domestic install — Haywood Village, Weston-super-Mare -
Wall-mounted EV charger installed as part of the same job
Our published job · Project page: Domestic install — Haywood Village, Weston-super-Mare -
31 individual 3.6 kW PV systems across one apartment block
Our published job · Project page: X31 — 31 flats, Watchet -
Delivered under the ECO4 scheme
Our published job · Project page: X31 — 31 flats, Watchet -
TIGO module-level rapid shutdown and per-flat monitoring
Our published job · Project page: X31 — 31 flats, Watchet -
Full scaffolding to all flats via 100% Access Ltd
Our published job · Project page: X31 — 31 flats, Watchet -
A Google review from Chris Sanders, whose install is our Shiplate project.
Review location · Google review from our Shiplate customer -
A Google review from K. L., whose install is our Haywood Village project.
Review location · Google review from our Haywood Village customer -
A Checkatrade review of a job in BS22 — the Weston-super-Mare postcode district our base is in.
Review location · Checkatrade profile: job location BS22 -
Haywood Village is 3 miles from our base in Weston-super-Mare (straight-line distance).
Distance · Straight-line distance from OS Open Names coordinates -
Shiplate, Bleadon is 5 miles from our base in Weston-super-Mare (straight-line distance).
Distance · Straight-line distance from OS Open Names coordinates -
Watchet is 22 miles from our base in Weston-super-Mare (straight-line distance).
Distance · Straight-line distance from OS Open Names coordinates
FAQs
Working in the South West: your questions.
Straight answers about coverage, surveys and installs.
All FAQsSend photos of your roof, fuse box or bill on WhatsApp
Message on WhatsAppYes — we work nationwide across the UK from our base in Weston-super-Mare. Our published South West projects are homes in Bleadon, Weston-super-Mare and Watchet.
Our South West case studies are Shiplate in Bleadon (12 kW of solar with a 10 kWh Fox ESS battery), Haywood Village in Weston-super-Mare (all-black solar, a Fox ESS battery and an EV charger) and 31 flats in Watchet with individual 3.6 kW systems. Each has its own project page.
Your system connects to the local distribution network. The Energy Networks Association’s postcode finder returns National Grid Electricity Distribution for our South West job locations, though some properties are on an independent network instead. For homes, the DNO notification is part of our handover.
Usually not for a roof array on a house: in England that is permitted development if the panels stand no more than 0.2 m out from the roof slope and no higher than the highest part of the roof. A listed home needs planning permission and listed building consent, and North Somerset Council has Article 4 Directions in parts of Weston-super-Mare, so check your street before relying on permitted development.
Each kilowatt facing due south makes roughly 1,030 kWh a year at our Weston-super-Mare office and about 992 at Watchet, on PVGIS figures. Few real roofs face due south without shade, so the free design models yours — direction, pitch and shading — before we quote.
Other areas
Nationwide, from Weston-super-Mare.
Ready when you are
Ready to go 100% renewable?
Thinking about solar panels in Somerset or North Somerset? Tell us about your property and we’ll design a system around your roof, your usage and your budget — with no obligation.
- Office hours
- Mon–Fri, 8am–6pm
- Head office
- Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
- +44 7301 468735
- 1Your property
- 2About the project
- 3Your details
