Business · Commercial EV charging
Commercial EV charging infrastructure for fleets and workplaces.
Fleet and workplace charging from single 7 kW units to multi-bay 22 kW and DC rapid arrays.
- Single fleet and workplace units
- 7 kW
- Multi-bay charging
- 22 kW
- Charging arrays
- DC rapid
- Charging from on-site generation
- Solar-linked
What’s included
From the capacity study to the back office.
The chargers are the visible part. The supply behind them, the routes to each bay and the software that runs them decide how well they work.
-
Load management & capacity study
We check what the site’s supply can carry before chargers are specified, then use load management so the charge points share the capacity available.
-
Ducting, groundworks & feeder pillars
The civil and electrical routes to every bay — ducting, groundworks and feeder pillars — planned with the charger layout so every bay has its supply route.
-
Back-office / billing integration
Charge points connected to a back-office platform, so sessions can be managed, monitored and, where you need it, billed to staff, visitors or cost centres.
-
Solar-linked charging
Chargers set up to draw on on-site solar where a site has it, whether from a rooftop array or a solar carport over the bays.
-
Single 7 kW units to multi-bay 22 kW and DC rapid arrays
Charger power matched to how long vehicles stay on site — from single units for long stays to rapid arrays for quick turnarounds.
Load management & capacity study
Start with what the supply can carry.
A row of chargers adds a large new load to a site’s electricity supply. The capacity study establishes what the existing connection can carry alongside everything else on site, and where its limits are, before any charge points are chosen.
Load management then shares the available capacity across the chargers, so bays can charge together without overloading the supply. It also sets a realistic number of bays for the supply you have, and if the connection itself needs to grow, the study shows that before installation rather than after it.
-
Measure
What the supply already carries, and when.
-
Plan
How many chargers, at what power, and where.
-
Balance
Load management sharing capacity across the bays.
7 kW, 22 kW and DC rapid
Match the charger to the stop.
How long vehicles stay parked decides what they need. Fleet vans back at base overnight and staff cars parked through the working day suit 7 kW units; shorter stays suit multi-bay 22 kW charging; quick turnarounds are what DC rapid arrays are for.
A car’s own on-board charger also limits how fast it can take AC power, so a higher-rated AC unit won’t always charge a given vehicle faster. Fleet schedules matter as much as charger power: vehicles that return at the same time need the capacity shared between them. The capacity study weighs all of it before anything is specified.
-
7 kW
Single units for long stays at depots and workplaces.
-
22 kW
Multi-bay charging where vehicles stop for shorter spells.
-
DC rapid
Arrays for quick turnarounds.
Groundworks to back office
The routes, pillars and software behind every bay.
Most of a charging project happens out of sight. Ducting and groundworks carry cables to each bay, feeder pillars distribute the supply across the car park, and a back-office platform connects the charge points so sessions can be managed, monitored and billed where that’s needed.
Planning them together with the charger layout puts the routes in the right place from the start, including for any bays a site plans to add later. Feeder pillars also give a protected point to distribute the supply to groups of bays.
-
Ducting & groundworks
Cable routes to each bay.
-
Feeder pillars
Distribution across the car park.
-
Back office
Session management and billing integration.
Grants & funding
Funding routes for business sites.
Finance routes for business assets — conditions shown in full on the funding page.
For businesses & landlords
Commercial asset finance & leasing
Hire purchase, finance lease and operating lease for business charging assets. New EV charge-point equipment currently qualifies for a 100% first-year allowance, to April 2027. We don’t arrange, broker or advise on finance — take your own tax advice.
Scheme details correct as of 2026. Grant funding, eligibility criteria and tariffs change frequently — always confirm current terms with the scheme administrator or with our team before committing.
How it works
From half-hourly data to commissioning.
One contractor, fully accountable from feasibility to commissioning.
- 01 Your data
Feasibility
Send us your roof plan or half-hourly data — we model generation against your actual load profile.
- 02 Design
Design & G99
Structural and wind-load assessment, string design and the G99 / DNO application, handled end to end.
- 03 On programme
Installation
Scaffold and access by 100% Access Ltd, then our in-house teams install — phased around your operation where needed.
- 04 Handover
Commissioning & O&M
Testing and certification at handover, then planned and reactive maintenance with 24/7 emergency call-out.
Solar-linked charging
Charge from what the site generates.
Sites with their own generation can put it to work in their vehicles. Solar-linked charging sets chargers up to use on-site solar — from a rooftop array or a solar carport that shelters the bays it powers — so daytime charging can draw on the site’s own generation. Solar-aware charging can route surplus solar into vehicles during the day without pulling from the grid.
It also ties the charging load into the rest of the energy system: the capacity study, the array and any commercial battery storage are designed together, by one contractor.
-
Rooftop arrays
Generation from the building’s own roof.
-
Solar carports
Canopies that generate on-site power and host charge points.
-
Battery storage
Stored energy shifted to when vehicles need it.
FAQs
Commercial EV charging: your questions.
Straight answers from the team who quotes and installs.
All FAQsSend a roof photo, site plan or half-hourly data on WhatsApp
Message on WhatsAppThat’s what the load management and capacity study is for. We establish what the site’s supply can carry before chargers are specified, then use load management to share the available capacity across the bays. If the connection itself needs to grow, the study shows that before anything is installed.
Fleet and workplace charging from single 7 kW units to multi-bay 22 kW and DC rapid arrays. The right mix depends on how long vehicles stay on site and what the supply can carry, and the capacity study sets that out. A car’s on-board charger also limits how fast it can take AC power.
Back-office and billing integration is part of our EV infrastructure work, so charging sessions can be managed and billed where you need that. Whether sessions are free for your own fleet or billed to staff or visitors is set up in the back office.
Yes. Ducting, groundworks and feeder pillars are part of the package, planned with the charger layout, including routes for any bays you plan to add later — so you deal with one contractor from the capacity study to the finished bays.
Solar-linked charging sets chargers up to use on-site generation, whether from a rooftop array or a solar carport over the bays. How much of the charging it covers depends on when vehicles plug in and what the array is generating at the time.
Ready when you are
Ready to go 100% renewable?
Send us your roof plan or half-hourly data. We’ll model generation against your actual load profile and come back with capacity, cost, payback and the funding routes available.
- Office hours
- Mon–Fri, 8am–6pm
- Head office
- Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
- +44 7301 468735
Where we work, nationwide from Weston-super-Mare
- 1Your site
- 2About the project
- 3Your details
