Business · Solar carports

Solar carport canopies for business car parks.

Steel canopy carports that generate on-site power, shelter vehicles and host EV charge points.

Canopy arrays over bays · charge points · cable route to the board
Drawn layout: canopy arrays over parking bays, with charge points and a cable route to the board.
Single and double-bay canopies
Steel
Charge points hosted by the canopy
EV
Foundation and civils design
Civils
DNO applications handled end-to-end
G99

What’s included

The canopy, its foundations and its chargers, designed together.

A carport turns parking space into generating space. The structure, the civils and the charging are planned as one job.

  • Single and double-bay canopies

    Steel canopy structures in single or double-bay form, laid out to suit the parking they cover and the way vehicles use it.

  • Integrated EV charging

    Charge points built into the canopy, so the structure that shelters vehicles also charges them.

  • Foundation & civils design

    Foundations and civils designed for the canopy and the ground it stands on, with cable routes to the chargers planned in.

  • Planning support

    We help you work out what the planning process needs for your site, and help prepare it. The decision itself rests with the local planning authority.

  • G99 / DNO applications

    A canopy that generates connects to the grid like any array, and we handle G99 and DNO applications end-to-end.

  • Containment, SWA and cable pulls

    Cable runs from the canopy array and charge points back to the board, from the team that delivers our electrical works.

Generate, shelter, charge

Parking space that generates power.

A solar carport puts a steel canopy over parking bays and an array on top of it. The same structure generates on-site power, shelters the vehicles underneath and hosts EV charge points, so the car park does three jobs instead of one. Where the roof is already full, a canopy adds generating space beside the solar panels on the roof.

Where a roof is unsuitable, already full or not yours to use, the car park can be the next place to generate. With chargers under the array, generation and charging demand sit in the same place — and canopies are a good fit for bifacial panels, which capture reflected light from the rear and can add 5–15% extra generation.

  1. Generate

    On-site power from the canopy array.

  2. Shelter

    Vehicles parked under cover.

  3. Charge

    EV charge points hosted by the canopy.

Foundation & civils design

Built from the ground up.

A carport is a structure in a working car park, so the design starts below ground. Foundations are designed for the canopy and the ground conditions, and the civils, including the cable routes and ducting to the charge points, are planned alongside them.

Doing that design work together keeps the canopy, the electrical routes and the chargers aligned, so each bay gets the cable run it needs. Where charge points are planned for later, ducting can go in with the foundations so the ground doesn’t need opening again.

Pad foundationDuctingCharge pointColumns on pad foundations · ducting for the charge points · cable to the board
Illustration: a canopy in section, from pad foundations to the charge point — not a specific site.
  1. Foundations

    Designed for the canopy and the ground it stands on.

  2. Ducting

    Cable routes to the charge points, planned in from the start.

  3. Connection

    A route back to the board for the array and the chargers.

Planning support

Planning, looked at early.

A canopy over a car park is a new structure, and whether it needs planning permission depends on the site, its location and the size of the scheme. That’s worth knowing before a design is fixed, so planning is looked at early rather than left to the end.

Planning support means we help establish what your local planning authority will want to see, and help prepare it. The decision always rests with the authority, so no scheme is presented as consented before it is.

  1. Early check

    Whether consent is likely to be needed for your site.

  2. Supporting information

    The drawings and details the authority asks for, prepared with the design.

  3. The decision

    Made by the local planning authority — not something we can promise.

Grants & funding

Funding routes for business sites.

Finance routes for business assets — conditions shown in full on the funding page.

Every grant, loan and PPA

Scheme details correct as of 2026. Grant funding, eligibility criteria and tariffs change frequently — always confirm current terms with the scheme administrator or with our team before committing.

How it works

From half-hourly data to commissioning.

One contractor, fully accountable from feasibility to commissioning.

  1. 01
    Your data

    Feasibility

    Send us your roof plan or half-hourly data — we model generation against your actual load profile.

  2. 02
    Design

    Design & G99

    Structural and wind-load assessment, string design and the G99 / DNO application, handled end to end.

  3. 03
    On programme

    Installation

    Scaffold and access by 100% Access Ltd, then our in-house teams install — phased around your operation where needed.

  4. 04
    Handover

    Commissioning & O&M

    Testing and certification at handover, then planned and reactive maintenance with 24/7 emergency call-out.

Integrated EV charging

Generation and charging in one structure.

Charge points built into the canopy put charging where vehicles already park. The canopy array, the chargers and the supply behind them are designed as one system, with a load management and capacity study covering what the site’s connection can carry. Where the site already has a rooftop array or battery storage, the canopy is designed to work alongside it.

The canopy’s generation connects like any other array — we handle G99 and DNO applications end-to-end — and the electrical package from canopy to board comes from the same team.

Charge bays · ducting to a feeder pillar · load management
Illustration: charge bays with ducting back to a feeder pillar — not a specific site.
  1. Charge points

    Hosted by the canopy over the bays.

  2. Solar-linked charging

    Chargers set up to use the canopy’s own generation.

  3. G99 / DNO

    The grid connection for the generating side, handled end-to-end.

FAQs

Solar carports: your questions.

Straight answers from the team who quotes and installs.

All FAQs

Send a roof photo, site plan or half-hourly data on WhatsApp

Message on WhatsApp

It depends on the site, its location and the size of the scheme, so it’s one of the first things we look at, before the design is fixed. Planning support is part of our carport service: we help prepare what the local planning authority asks for, but the decision rests with the authority.

Yes. Integrated EV charging is one of our carport options: the canopy hosts the charge points, and the chargers can be set up to use the solar it generates. A load management and capacity study makes sure the site’s supply can carry them.

Single and double-bay steel canopies, laid out to suit the parking they cover. Foundation and civils design is part of the job, so the structure is designed for the ground it stands on, with ducting and cable routes for any charge points planned in from the start.

A canopy that generates connects to the grid like any other array. Generation above the G98 limit of 16 A per phase needs a G99 application and DNO approval before it connects, and we handle G99 and DNO applications end-to-end.

Not every roof can take an array: it may be unsuitable, already full or not yours to use. A carport generates from the car park instead, shelters vehicles and hosts charge points, and it can sit alongside a rooftop system on the same site.

Ready when you are

Ready to go 100% renewable?

Send us your roof plan or half-hourly data. We’ll model generation against your actual load profile and come back with capacity, cost, payback and the funding routes available.

Office hours
Mon–Fri, 8am–6pm
Head office
Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
  1. 1Your site
  2. 2About the project
  3. 3Your details

Free feasibility study

Tell us about your site and we’ll come back with capacity, cost, payback and the funding routes available.

Enter your postcode.

What do you need?

Choose one option.

About the project

A little more detail helps us design the right system first time.

Roof or site type
When are you looking to install?

Your details

Last step — then we’ll be in touch.

Enter your name.

Enter a phone number.

Enter a valid email address.

Thanks, we’ve received your details.

Our team replies within 24 hours to discuss your site.