Solar farms · LV / MV works

Solar farm LV and MV works, from inverter station to MV cable.

Inverter station and transformer connections, LV distribution, MV cable installation, jointing and terminating.

Compound Point of connection
Illustration: a ground-mount solar farm layout with the inverter stations, MV cable and point of connection highlighted — not a specific site.
Distribution & switchgear
LV
Cable pulling & jointing
MV
Transformer / RMU connections
RMU
Interface management
DNO

What’s included

Inverter stations, switchgear, MV cables and earthing.

The electrical works that join the plant together, from the inverter stations out along the MV cable — with earthing installed as the stations go in and the DNO kept in step with the programme.

  • LV distribution & switchgear

    The low-voltage side of each station: distribution and switchgear connected and terminated, ready for pre-energisation testing.

  • MV cable pulling & jointing

    MV cable pulled off the drum and along its route within the cable maker’s pulling and bending limits, then jointed.

  • Transformer / RMU connections

    Cables terminated into the transformer and the ring main unit — the enclosed MV switchgear that switches and isolates the circuit.

  • Earthing & bonding systems

    Earthing and bonding installed with the stations, so fault current has a safe path to ground.

  • Interface management with the DNO

    Connection dates, access and paperwork kept in step with the network operator as the works approach energisation.

How the power gets out

From inverter to MV cable, in one package.

On a ground-mount scheme the power path runs from the DC strings into inverters, through LV distribution to a transformer that steps the voltage up, then out through MV switchgear and cable towards the point of connection. Every connection along that path, from the inverter terminals to the last MV joint, sits in this one package — one team and one record from station to cable.

StringsInverterLV boardTransformerMVswitchgearPoint ofconnectionDCLOW VOLTAGEMEDIUM VOLTAGEStrings to inverters, LV distribution, the transformer and MV switchgear
Illustration: the power path from strings to the point of connection — not a specific site.
  1. Inverter

    Station connections made and terminated.

  2. Transformer

    Steps the voltage up for export.

  3. RMU

    Connects the station to the MV cable.

  4. MV cable

    Carries the power towards the point of connection.

MV cable and joints

Pulled with care, jointed by the instructions.

MV cable is unforgiving of rough handling. Every cable has a maximum pulling tension and a minimum bending radius, and a cable pulled harder or bent tighter than that can be damaged in ways nobody sees until it fails. So the pull is planned from the drum to the end of the route, and each joint and termination is made to its accessory maker’s instructions.

TopsoilSubsoilMarker tapeDucts and cableTopsoil and subsoil kept apart · ducts and cable bedded · marker tape before backfill
Illustration: cable bedded in a trench, in section — not a specific site.
  1. Plan the pull

    Route, drum position and pulling limits worked out first.

  2. Pull

    Cable drawn along its route without over-bending.

  3. Joint

    Joints and terminations made to the accessory instructions.

  4. Test

    Cable ready for pre-energisation testing.

Working with us

One contractor, directly employed teams.

  • Self-delivered labour

    Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.

  • Access in-house

    Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.

  • Documented to audit standard

    RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.

  • Mobilise quickly

    Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.

How a package runs

Tender pack to energisation.

Take one package or the lot — self-delivered, and documented as the work proceeds.

  1. 01
    Enquiry

    Tell us about the scheme

    We price the packages you need against your programme and scope.

  2. 02
    Week one

    Mobilise

    Welfare, compounds, access and inductions set up so the site works from week one.

  3. 03
    As we go

    Deliver & document

    Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.

  4. 04
    Handover

    Energise & hand over

    Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.

Energisation

Ready when the network is.

Interface management with the DNO keeps the plant side in step with the network operator: connection dates, access to the point of connection, energisation arrangements and the paperwork the DNO asks for. The electrical works are planned to be finished and tested by the time the connection is ready.

Earthing sits alongside it. Earthing and bonding systems go in with the inverter and transformer stations rather than being added at the end, so they are in place, tested and recorded before the plant is energised — one less thing to chase in the final weeks before connection.

  1. Dates

    Connection and energisation dates kept in step with the DNO.

  2. Access

    The point of connection reachable when the network operator needs it.

  3. Paperwork

    The documents the DNO asks for, ready in time.

  4. Earthing

    In place and tested before energisation.

References

Site references and method statements, on request.

We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.

FAQs

LV / MV works: your questions.

Straight answers from the team who quotes and installs.

All FAQs

Email a tender pack, drawings or programme

Email the team

Yes. The LV / MV works can be taken on their own or alongside DC installation, trenching and civils, and testing and commissioning — we deliver full or partial scope on ground-mount schemes.

Yes. Interface management with the DNO is part of how we deliver solar farm schemes, and grid application and DNO liaison are part of our end-to-end solar farm service.

Yes. MV cable pulling and jointing, and the transformer and RMU connections at each station, are all part of the LV / MV package.

Ready when you are

Ready to go 100% renewable?

Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.

Office hours
Mon–Fri, 8am–6pm
Head office
Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ

Solar farm packages, nationwide from Weston-super-Mare

  1. 1Your site
  2. 2About the project
  3. 3Your details

Tender enquiry

Tell us about the scheme and the packages you need. Take one package or the lot.

Enter your postcode.

Packages

Choose one option.

About the project

A little more detail helps us design the right system first time.

Roof or site type
When are you looking to install?

Your details

Last step — then we’ll be in touch.

Enter your name.

Enter a phone number.

Enter a valid email address.

Thanks, we’ve received your details.

Our team replies within 24 hours to discuss the scheme.