Solar farms · LV / MV works
Solar farm LV and MV works, from inverter station to MV cable.
Inverter station and transformer connections, LV distribution, MV cable installation, jointing and terminating.
- Distribution & switchgear
- LV
- Cable pulling & jointing
- MV
- Transformer / RMU connections
- RMU
- Interface management
- DNO
What’s included
Inverter stations, switchgear, MV cables and earthing.
The electrical works that join the plant together, from the inverter stations out along the MV cable — with earthing installed as the stations go in and the DNO kept in step with the programme.
-
LV distribution & switchgear
The low-voltage side of each station: distribution and switchgear connected and terminated, ready for pre-energisation testing.
-
MV cable pulling & jointing
MV cable pulled off the drum and along its route within the cable maker’s pulling and bending limits, then jointed.
-
Transformer / RMU connections
Cables terminated into the transformer and the ring main unit — the enclosed MV switchgear that switches and isolates the circuit.
-
Earthing & bonding systems
Earthing and bonding installed with the stations, so fault current has a safe path to ground.
-
Interface management with the DNO
Connection dates, access and paperwork kept in step with the network operator as the works approach energisation.
How the power gets out
From inverter to MV cable, in one package.
On a ground-mount scheme the power path runs from the DC strings into inverters, through LV distribution to a transformer that steps the voltage up, then out through MV switchgear and cable towards the point of connection. Every connection along that path, from the inverter terminals to the last MV joint, sits in this one package — one team and one record from station to cable.
-
Inverter
Station connections made and terminated.
-
Transformer
Steps the voltage up for export.
-
RMU
Connects the station to the MV cable.
-
MV cable
Carries the power towards the point of connection.
Full or partial scope
Where this package sits on a solar farm build.
Take one package or the lot — every package is self-delivered by directly employed teams.
- Solar farm Site mobilisation Welfare, compounds, access and inductions
- Solar farm Trenching & civils Cable routes, ducting and station bases
- Solar farm Mechanical installation Setting-out, structures and module install
- Solar farm DC installation String wiring, combiners and terminations
- Solar farm LV / MV works Inverter stations, MV cables and jointing
- Solar farm Testing & commissioning Energisation testing with an evidence pack
- Solar farm O&M Preventative maintenance and reporting
MV cable and joints
Pulled with care, jointed by the instructions.
MV cable is unforgiving of rough handling. Every cable has a maximum pulling tension and a minimum bending radius, and a cable pulled harder or bent tighter than that can be damaged in ways nobody sees until it fails. So the pull is planned from the drum to the end of the route, and each joint and termination is made to its accessory maker’s instructions.
-
Plan the pull
Route, drum position and pulling limits worked out first.
-
Pull
Cable drawn along its route without over-bending.
-
Joint
Joints and terminations made to the accessory instructions.
-
Test
Cable ready for pre-energisation testing.
Working with us
One contractor, directly employed teams.
-
Self-delivered labour
Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.
-
Access in-house
Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.
-
Documented to audit standard
RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.
-
Mobilise quickly
Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.
How a package runs
Tender pack to energisation.
Take one package or the lot — self-delivered, and documented as the work proceeds.
- 01 Enquiry
Tell us about the scheme
We price the packages you need against your programme and scope.
- 02 Week one
Mobilise
Welfare, compounds, access and inductions set up so the site works from week one.
- 03 As we go
Deliver & document
Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.
- 04 Handover
Energise & hand over
Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.
Energisation
Ready when the network is.
Interface management with the DNO keeps the plant side in step with the network operator: connection dates, access to the point of connection, energisation arrangements and the paperwork the DNO asks for. The electrical works are planned to be finished and tested by the time the connection is ready.
Earthing sits alongside it. Earthing and bonding systems go in with the inverter and transformer stations rather than being added at the end, so they are in place, tested and recorded before the plant is energised — one less thing to chase in the final weeks before connection.
-
Dates
Connection and energisation dates kept in step with the DNO.
-
Access
The point of connection reachable when the network operator needs it.
-
Paperwork
The documents the DNO asks for, ready in time.
-
Earthing
In place and tested before energisation.
References
Site references and method statements, on request.
We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.
FAQs
LV / MV works: your questions.
Straight answers from the team who quotes and installs.
All FAQsEmail a tender pack, drawings or programme
Email the teamYes. The LV / MV works can be taken on their own or alongside DC installation, trenching and civils, and testing and commissioning — we deliver full or partial scope on ground-mount schemes.
Yes. Interface management with the DNO is part of how we deliver solar farm schemes, and grid application and DNO liaison are part of our end-to-end solar farm service.
Yes. MV cable pulling and jointing, and the transformer and RMU connections at each station, are all part of the LV / MV package.
Ready when you are
Ready to go 100% renewable?
Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.
- Office hours
- Mon–Fri, 8am–6pm
- Head office
- Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
- +44 7301 468735
Solar farm packages, nationwide from Weston-super-Mare
- 1Your site
- 2About the project
- 3Your details