Illustrative photo Business · Commercial electrical works
Commercial electrical works around your solar array.
The full electrical package around the array — so you deal with one contractor, not five.
- Distribution and switchgear
- LV
- Containment and cable pulls
- SWA
- Metering and CT installation
- CTs
- Full electrical installation at Tan Sales
- 320 kW
What’s included
Everything between the array and the board.
One contractor for the roof and the electrics — the same in-house team from the first cable pull to certification.
-
LV distribution & switchgear
The array’s connection into the site’s low-voltage distribution, including the switchgear it lands on and the protection around it.
-
Containment, SWA and cable pulls
Tray and containment routed across the roof, with steel-wire-armoured (SWA) cable pulled through to the inverter and switchgear positions.
-
Metering & CT installation
Meters and current transformers (CTs) installed so generation, import and export are measured where the system needs them.
-
Testing & certification
The installation tested, with certification issued at handover, before the system is put to work.
-
Three-phase grid connection engineered and commissioned
At our Birmingham factory install, the three-phase connection was engineered and commissioned alongside 220 kW across four roofs, with the string layout optimised across all four roof aspects.
-
Full SolarEdge rapid-shutdown system installed and commissioned
On the 320 kW Tan Sales roof in London, the rapid-shutdown safety system was part of our full electrical installation, installed and commissioned by our in-house team.
One contractor, not five
The roof and the electrics, from one team.
On a commercial solar job, the panels are only part of the work. Behind them sit cable routes, containment, switchgear, metering and the testing that signs it all off. Splitting those between separate contractors creates interfaces to manage; keeping them together leaves one team accountable for the whole system, with one programme from feasibility to commissioning. One set of drawings, one set of test results and one team answering for both.
At Tan Sales in London, our in-house team delivered the rooftop mounting and full electrical installation for a 320 kW, 770-panel system, including a SolarEdge rapid-shutdown safety system, and commissioned the completed system.
LV, switchgear and metering
Connected properly to the site’s supply.
An array only helps the site once its output reaches the building’s distribution. LV distribution and switchgear works make that connection, and on a three-phase supply it has to be engineered to suit — as at our Birmingham factory install, where the three-phase grid connection was engineered and commissioned by our team.
Metering and CT installation complete the picture, measuring what the system generates and what the site imports and exports, so export limitation, battery control and monitoring all work from accurate readings. Where a battery or EV chargers join the system, the same distribution and metering work carries them too.
-
LV distribution
The array’s supply into the building’s distribution.
-
Switchgear
Protection and isolation at the connection point.
-
Metering & CTs
Generation, import and export measured accurately.
Products
The kit on our own jobs.

SolarEdge optimisers
The rapid-shutdown safety system on the 320 kW Tan Sales roof in London.
- Products4brands on our own installs, each with the jobs it’s used on.See every brand
Case studies
Delivered on live, operational sites.
Illustrative photo
Containment, SWA and cable pulls
Cable routes that suit the roof.
Getting DC cabling from a large roof to the inverters takes planned routes. On the Isle of Wight, the array layout and DC cable routes were coordinated around multiple existing skylights and rooftop services, with a clean, practical containment run back to the inverter position.
At Compass House, DC cabling and tray/containment were routed cleanly across a multi-pitched roof with five aspects; at Avonmouth Docks, the same package ran across a standing-seam warehouse roof. Tray and containment protect cables from weather and damage, and keep routes tidy and traceable for anyone who maintains the system later.

How it works
From half-hourly data to commissioning.
One contractor, fully accountable from feasibility to commissioning.
- 01 Your data
Feasibility
Send us your roof plan or half-hourly data — we model generation against your actual load profile.
- 02 Design
Design & G99
Structural and wind-load assessment, string design and the G99 / DNO application, handled end to end.
- 03 On programme
Installation
Scaffold and access by 100% Access Ltd, then our in-house teams install — phased around your operation where needed.
- 04 Handover
Commissioning & O&M
Testing and certification at handover, then planned and reactive maintenance with 24/7 emergency call-out.
Testing & certification
Tested, documented and safe to hand over.
Testing and certification close out the electrical package. The installation is tested and its certification issued at handover, giving the site, its insurer and anyone who works on the system later a clear record of what was installed and how it was tested.
Safety systems are part of it too. Rapid shutdown drops the DC voltage on the roof to a safe level at the push of a button — essential for firefighter safety and increasingly expected on commercial installs. At Tan Sales we installed and commissioned a full SolarEdge rapid-shutdown system.

FAQs
Electrical works: your questions.
Straight answers from the team who quotes and installs.
All FAQsSend a roof photo, site plan or half-hourly data on WhatsApp
Message on WhatsAppYes. We deliver the full electrical package around the array — LV distribution and switchgear, containment, SWA and cable pulls, metering and CT installation, and testing and certification — so you deal with one contractor, not five, with one programme from feasibility to commissioning.
Yes. On our 220 kW Birmingham factory install, the in-house team delivered the rooftop mounting and the full electrical side, including a three-phase grid connection engineered and commissioned for four roofs facing different ways, with the string layout engineered to maximise generation across every roof orientation.
Yes. At Tan Sales in London we installed and commissioned a full SolarEdge rapid-shutdown system on a 320 kW roof. Rapid shutdown drops the DC voltage on the roof to a safe level at the push of a button — essential for firefighter safety and increasingly expected on commercial installs. SolarEdge systems also provide module-level monitoring.
They measure what the system generates and what the site imports and exports. Export limitation, battery control and monitoring all rely on those readings being accurate — without them, export limitation can’t reliably hold the agreed export level — which is why metering and CT installation are part of our electrical works.
Yes. Testing and certification are part of the electrical works package, completed at handover alongside the G99 and DNO applications we handle end-to-end. The test results and certification give the site a clear record of what was installed.
Ready when you are
Ready to go 100% renewable?
Planning commercial electrical works around your array? Send us your roof plan or half-hourly data — we’ll come back with capacity, cost, payback and the funding routes available.
- Office hours
- Mon–Fri, 8am–6pm
- Head office
- Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
- +44 7301 468735
Where we work, nationwide from Weston-super-Mare
- 1Your site
- 2About the project
- 3Your details