Areas · Midlands
Commercial solar panels in Birmingham and the Midlands.
We fit solar panels in Birmingham and across the Midlands from our base in Weston-super-Mare, and work nationwide. Our published Midlands project is a 220 kW factory rooftop in Birmingham, where our in-house team delivered both the rooftop mounting and the full electrical side.

- Install mapped here
- 1
- Miles from our base
- 88
- Services delivered here
- 3
- Verifiable local data points
- 6
Midlands on the map
Every pin is a job we’ve installed.
Factory rooftop solar, electrical works in-house. Pick a pin for the details.
- Jobs we’ve installed
- Our base
- Towns and cities
- Pick a pin for the detailsTap a pin for the details
Midlands
Factory rooftop solar, electrical works in-house.
- Birmingham 220 kW across 4 factory roofs
Nationwide service across the UK. Wherever your home or site is, it starts with a free design.
Get a free designDistance from our base
Where we’ve worked in the Midlands.
- Birmingham 88 miles
220 kW commercial solar PV system designed and installed across four factory roofs, engineered to maximise generation across every roof orientation.
Local context
- Network operator
The Energy Networks Association’s postcode finder returns National Grid Electricity Distribution for Birmingham, in its West Midlands licence area. Some sites are connected to an independent network operator (IDNO) instead; the Distributor ID on the electricity bill helps identify which.
Energy Networks Association — Who’s my electricity network operator? - G98 and G99
G99 sets the requirements for connecting generation equipment to public distribution networks; G98 covers small, fully type-tested micro-generators. ENA doesn’t process the forms — they go to the local network operator where the generation connects.
Energy Networks Association — Connecting generation
Solar in Birmingham
What solar panels make in Birmingham.
Birmingham gets the least sun of anywhere on our map, but less is a long way from little. PVGIS gives about 937 kWh a year from each south-facing kilowatt there — around 91% of what the same kilowatt makes at our Weston-super-Mare office.
On a factory, aspect is the other big lever. Our 220 kW install spread its strings across four separate roofs, and the figures show why that layout work matters: split east and west at 35°, a Birmingham kilowatt makes 745 kWh a year, 80% of a south-facing one, with more of it arriving at the start and end of the working day.
The months swing hard, too — about 114 kWh per kilowatt in June against 31 in December, 3.7 times as much in the best month as the darkest — so we design a site around its half-hourly load, never an annual total.
937kWh
a year from one south-facing kilowatt in Birmingham, month by month
Data last reviewed: October 2026
Photographed jobs
Our installs in the Midlands.
Birmingham factory rooftop
Four factory roofs, one 220 kW system.
The Birmingham job is a commercial solar PV system designed and installed across four factory roofs with a corrugated metal profile. Our in-house team delivered both the rooftop mounting and the full electrical side, engineering the string layout and three-phase connection to maximise generation across every roof orientation.
-
Rooftop mounting
Across four separate corrugated metal factory roofs.
-
Full electrical side
Delivered by our in-house team as part of the same job.
-
String layout
Optimised across all four roof aspects.
-
Three-phase connection
The grid connection engineered and commissioned.
How we work in the Midlands
Arrays built around your load profile.
We work nationwide across the UK from our base in Weston-super-Mare. For a manufacturing or logistics site, we model generation against your actual load profile and come back with capacity, cost, payback and the funding routes available — then design a high-output industrial PV array for a site where load profile and power quality matter as much as yield.
-
Half-hourly load matching
Generation modelled against your site’s actual load profile.
-
Three-phase & LV switchgear works
The full electrical package around the array — so you deal with one contractor, not five.
-
Phased installs around production
Installation planned in phases around your production.
-
Export limitation where required
Designed in where the grid connection calls for it.
Services
What we’ve delivered in the Midlands.
-
Commercial rooftop · Business sites
Warehouse, office, retail and public-sector roofs
-
Industrial PV · Business sites
High-output arrays for manufacturing sites
-
Electrical works · Business sites
LV distribution, switchgear and metering
Checkable facts
6 verifiable local data points on this page.
Every point below traces to one of our own published jobs, a review location or a straight-line distance from our base.
-
220 kW installed across four separate factory roofs
Our published job · Project page: Birmingham factory rooftop -
Rooftop install and full electrical side delivered by our team
Our published job · Project page: Birmingham factory rooftop -
Optimised string layout across all four roof aspects
Our published job · Project page: Birmingham factory rooftop -
Three-phase grid connection engineered and commissioned
Our published job · Project page: Birmingham factory rooftop -
Roof type: corrugated metal profile
Our published job · Project facts: Birmingham factory rooftop -
Birmingham is 88 miles from our base in Weston-super-Mare (straight-line distance).
Distance · Straight-line distance from OS Open Names coordinates
FAQs
Working in the Midlands: your questions.
Straight answers about coverage, surveys and installs.
All FAQsSend photos of your roof, fuse box or bill on WhatsApp
Message on WhatsAppYes — we work nationwide across the UK from our base in Weston-super-Mare. Our published Midlands project is a 220 kW factory rooftop in Birmingham.
220 kW of solar PV across four separate corrugated metal factory roofs, with an optimised string layout across all four roof aspects and a three-phase grid connection engineered and commissioned. Our team delivered both the rooftop install and the full electrical side.
The Energy Networks Association’s postcode finder returns National Grid Electricity Distribution, in its West Midlands licence area, for Birmingham. For business sites we handle the G99 and DNO applications end to end, as part of the design and installation.
Send us your roof plan or half-hourly data. We’ll model generation against your actual load profile and come back with capacity, cost, payback and the funding routes available.
Yes. On PVGIS figures, a kilowatt of panels facing due south in Birmingham makes around 937 kWh a year — less than on the coast, not far off it. What decides your own figure is the roof’s direction, pitch and shading, and for a business the half-hourly load; we model both before we quote.
Other areas
Nationwide, from Weston-super-Mare.
Ready when you are
Ready to go 100% renewable?
Thinking about solar panels in Birmingham or the Midlands? Send us your roof plan or half-hourly data and we’ll come back with capacity, cost, payback and the funding routes available.
- Office hours
- Mon–Fri, 8am–6pm
- Head office
- Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
- +44 7301 468735
- 1Your property
- 2About the project
- 3Your details
