Solar farms · Trenching & civils
Trenching and civils for solar farm builds.
Cable routes, ducting, drainage, hardstanding and station bases — coordinated with the electrical programme.
- Routes recorded as laid
- As-builts
- Trenched, laid and backfilled
- Ducts
- For inverter and transformer stations
- Bases
- Reinstated as each area closes
- Ground
What’s included
Routes, bases and reinstatement in one civils package.
The groundwork the electrical packages stand on — cable routes, ducts, station bases and hardstanding — and the ground put back afterwards.
-
Trenching, ducting & backfill
Trenches dug along the cable route, ducts laid where the design calls for them, and backfill placed to support and protect what’s buried.
-
Cable route marking & as-builts
Routes marked on the ground and drawn as they were actually laid, not as they were designed.
-
Station bases & hardstanding
Bases for the inverter and transformer stations, and hardstanding for access, built ready for the electrical packages that follow.
-
Reinstatement & drainage
Ground reinstated and drainage dealt with as each area closes out — compacted ground drains poorly.
-
Coordinated with the electrical programme
Trench, duct and base work sequenced with the DC and LV / MV packages, so routes and bases are planned to be ready when cable and station work arrives.
Before the first trench
Locate, dig, lay, record.
Trenching starts before any digging does. Existing services are located and marked on the ground first, because plans of what’s buried are rarely exact. Then the sequence runs trench by trench: dig, lay the ducts or cable, backfill so nothing buried is left unsupported, mark the route and record where it actually went.
-
Locate
Existing services found before digging.
-
Dig
Trenches opened along the planned route.
-
Lay
Ducts or cable in, then backfilled.
-
Record
Routes marked and drawn as laid.
Full or partial scope
Where this package sits on a solar farm build.
Take one package or the lot — every package is self-delivered by directly employed teams.
- Solar farm Site mobilisation Welfare, compounds, access and inductions
- Solar farm Trenching & civils Cable routes, ducting and station bases
- Solar farm Mechanical installation Setting-out, structures and module install
- Solar farm DC installation String wiring, combiners and terminations
- Solar farm LV / MV works Inverter stations, MV cables and jointing
- Solar farm Testing & commissioning Energisation testing with an evidence pack
- Solar farm O&M Preventative maintenance and reporting
Ground and weather
Soil handled so the field still works afterwards.
Cable trenches cross ground that has to drain and carry vegetation again once the works are finished. Topsoil comes off first and is kept apart from the subsoil beneath, plant keeps to set routes instead of criss-crossing the field, and trenches are backfilled in the right order so the ground can be put back as it was.
Wet weather changes when that can happen. Soil moved or driven over while it is saturated loses its structure and drains badly for years, so a phased programme digs and backfills when ground conditions allow rather than forcing the work through a wet spell and leaving the field to pay for it.
-
Topsoil
Stripped and kept apart for reinstatement.
-
Routes
Plant kept to set lines across the field.
-
Timing
Digging and backfill matched to ground conditions.
-
Close-out
Each area finished before the crew moves on.
Working with us
One contractor, directly employed teams.
-
Self-delivered labour
Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.
-
Access in-house
Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.
-
Documented to audit standard
RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.
-
Mobilise quickly
Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.
How a package runs
Tender pack to energisation.
Take one package or the lot — self-delivered, and documented as the work proceeds.
- 01 Enquiry
Tell us about the scheme
We price the packages you need against your programme and scope.
- 02 Week one
Mobilise
Welfare, compounds, access and inductions set up so the site works from week one.
- 03 As we go
Deliver & document
Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.
- 04 Handover
Energise & hand over
Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.
Interfaces and handover
Ready for the cable pulls, recorded for the asset owner.
At handover the asset owner receives the record of what went into the ground. Buried cable usually has no marker above it, so as-builts and route marking are what an O&M team relies on before it digs — whether that is to repair a cable or add a new one years later.
-
After mobilisation
Haul roads and access in place for plant and deliveries.
-
For cable
Routes and ducts ready for the DC and MV pulls.
-
For stations
Bases and hardstanding ready for inverter and transformer stations.
-
At handover
As-builts and route records for the asset owner.
References
Site references and method statements, on request.
We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.
FAQs
Trenching & civils: your questions.
Straight answers from the team who quotes and installs.
All FAQsEmail a tender pack, drawings or programme
Email the teamYes. Trenching and civils can be taken on their own, and the work is still coordinated with the electrical programme whoever delivers the DC and LV / MV works.
As-builts are drawings of where cables and ducts were actually laid. They protect anyone who digs on the site later and save an O&M team searching for a buried fault.
Yes. Station bases and hardstanding are part of the trenching and civils package, alongside cable routes, ducting, drainage and reinstatement.
Ready when you are
Ready to go 100% renewable?
Need solar farm civils and trenching? Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.
- Office hours
- Mon–Fri, 8am–6pm
- Head office
- Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
- +44 7301 468735
Solar farm packages, nationwide from Weston-super-Mare
- 1Your site
- 2About the project
- 3Your details