Solar farms · Trenching & civils

Trenching and civils for solar farm builds.

Cable routes, ducting, drainage, hardstanding and station bases — coordinated with the electrical programme.

Compound Point of connection
Illustration: a ground-mount solar farm layout with the cable trench routes highlighted — not a specific site.
Routes recorded as laid
As-builts
Trenched, laid and backfilled
Ducts
For inverter and transformer stations
Bases
Reinstated as each area closes
Ground

What’s included

Routes, bases and reinstatement in one civils package.

The groundwork the electrical packages stand on — cable routes, ducts, station bases and hardstanding — and the ground put back afterwards.

  • Trenching, ducting & backfill

    Trenches dug along the cable route, ducts laid where the design calls for them, and backfill placed to support and protect what’s buried.

  • Cable route marking & as-builts

    Routes marked on the ground and drawn as they were actually laid, not as they were designed.

  • Station bases & hardstanding

    Bases for the inverter and transformer stations, and hardstanding for access, built ready for the electrical packages that follow.

  • Reinstatement & drainage

    Ground reinstated and drainage dealt with as each area closes out — compacted ground drains poorly.

  • Coordinated with the electrical programme

    Trench, duct and base work sequenced with the DC and LV / MV packages, so routes and bases are planned to be ready when cable and station work arrives.

Before the first trench

Locate, dig, lay, record.

Trenching starts before any digging does. Existing services are located and marked on the ground first, because plans of what’s buried are rarely exact. Then the sequence runs trench by trench: dig, lay the ducts or cable, backfill so nothing buried is left unsupported, mark the route and record where it actually went.

  1. Locate

    Existing services found before digging.

  2. Dig

    Trenches opened along the planned route.

  3. Lay

    Ducts or cable in, then backfilled.

  4. Record

    Routes marked and drawn as laid.

Ground and weather

Soil handled so the field still works afterwards.

Cable trenches cross ground that has to drain and carry vegetation again once the works are finished. Topsoil comes off first and is kept apart from the subsoil beneath, plant keeps to set routes instead of criss-crossing the field, and trenches are backfilled in the right order so the ground can be put back as it was.

Wet weather changes when that can happen. Soil moved or driven over while it is saturated loses its structure and drains badly for years, so a phased programme digs and backfills when ground conditions allow rather than forcing the work through a wet spell and leaving the field to pay for it.

TopsoilSubsoilMarker tapeDucts and cableTopsoil and subsoil kept apart · ducts and cable bedded · marker tape before backfill
Illustration: a cable trench in section, topsoil and subsoil kept apart — not a specific site.
  1. Topsoil

    Stripped and kept apart for reinstatement.

  2. Routes

    Plant kept to set lines across the field.

  3. Timing

    Digging and backfill matched to ground conditions.

  4. Close-out

    Each area finished before the crew moves on.

Working with us

One contractor, directly employed teams.

  • Self-delivered labour

    Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.

  • Access in-house

    Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.

  • Documented to audit standard

    RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.

  • Mobilise quickly

    Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.

How a package runs

Tender pack to energisation.

Take one package or the lot — self-delivered, and documented as the work proceeds.

  1. 01
    Enquiry

    Tell us about the scheme

    We price the packages you need against your programme and scope.

  2. 02
    Week one

    Mobilise

    Welfare, compounds, access and inductions set up so the site works from week one.

  3. 03
    As we go

    Deliver & document

    Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.

  4. 04
    Handover

    Energise & hand over

    Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.

Interfaces and handover

Ready for the cable pulls, recorded for the asset owner.

At handover the asset owner receives the record of what went into the ground. Buried cable usually has no marker above it, so as-builts and route marking are what an O&M team relies on before it digs — whether that is to repair a cable or add a new one years later.

Handover packDOCUMENTSCOPEISSUEDSIGNED
Illustration: the handover record for what went into the ground — not a specific site.
  1. After mobilisation

    Haul roads and access in place for plant and deliveries.

  2. For cable

    Routes and ducts ready for the DC and MV pulls.

  3. For stations

    Bases and hardstanding ready for inverter and transformer stations.

  4. At handover

    As-builts and route records for the asset owner.

References

Site references and method statements, on request.

We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.

FAQs

Trenching & civils: your questions.

Straight answers from the team who quotes and installs.

All FAQs

Email a tender pack, drawings or programme

Email the team

Yes. Trenching and civils can be taken on their own, and the work is still coordinated with the electrical programme whoever delivers the DC and LV / MV works.

As-builts are drawings of where cables and ducts were actually laid. They protect anyone who digs on the site later and save an O&M team searching for a buried fault.

Yes. Station bases and hardstanding are part of the trenching and civils package, alongside cable routes, ducting, drainage and reinstatement.

Ready when you are

Ready to go 100% renewable?

Need solar farm civils and trenching? Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.

Office hours
Mon–Fri, 8am–6pm
Head office
Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ

Solar farm packages, nationwide from Weston-super-Mare

  1. 1Your site
  2. 2About the project
  3. 3Your details

Tender enquiry

Tell us about the scheme and the packages you need. Take one package or the lot.

Enter your postcode.

Packages

Choose one option.

About the project

A little more detail helps us design the right system first time.

Roof or site type
When are you looking to install?

Your details

Last step — then we’ll be in touch.

Enter your name.

Enter a phone number.

Enter a valid email address.

Thanks, we’ve received your details.

Our team replies within 24 hours to discuss the scheme.