Solar farms · Mechanical installation

Mechanical installation for ground-mount solar farms.

Pile setting-out, tracker and fixed-tilt table build, and module mounting to torque and traceability requirements.

Compound Point of connection
Illustration: a ground-mount solar farm layout with the module tables highlighted — not a specific site.
Piles positioned from survey control
Set-out
Fixed-tilt or tracker
Tables
Recorded as modules go on
Torque
Modules and parts logged as found
Broken

What’s included

From setting-out to the last module clamp.

Everything between a set-out field and finished tables, in the order the work has to happen — ready for the DC team to wire.

  • Setting-out & survey control

    Pile and table positions set out from the site’s survey control, so rows land where the layout and cable drawings expect them.

  • Fixed-tilt and tracker structures

    Fixed-tilt tables hold modules at one angle; trackers turn them east to west to follow the sun. Either is assembled to the structure supplier’s drawings.

  • Module install with torque records

    Each module fixed down and its fixings tightened to the specified torque, with the value written down at the time.

  • Damage and breakage reporting

    Broken or damaged modules and parts written up when they’re found, so the record shows what was damaged and where.

  • Traceability requirements

    Where a scheme asks for it, the record shows which modules went where — so a later fault can be traced to the modules involved.

The build sequence

Setting-out, structures, then modules.

Mechanical installation runs in a fixed order because each step sets up the next. Piles are set out, structures go up on them and modules go on last. A pile out of position pulls its table out of line, and that error surfaces again when modules are clamped and strings are wired — so it is cheapest to catch before the structure goes up.

01 Set out02 Build the table03 Mount modulesSetting-out · piles and table structures · modules clamped on, table by table
Illustration: setting-out, then the table structure, then modules — not a specific site.
  1. Mark out

    Pile positions pegged before any structure arrives.

  2. Build

    Tables or tracker rows assembled on the piles.

  3. Mount

    Modules lifted on and fixed down, table by table.

  4. Hand over

    Finished tables passed on for string wiring.

Why the records matter

Records that outlast the build.

A clamp left loose can work free over the years; one that’s over-tightened can distort a module frame. Neither is easy to spot once rows are full of modules, which is why the torque record matters: it is the evidence the array went together as specified, still available long after the crews have gone.

Traceability works the same way. If a string underperforms years into operation, a record of which modules went where lets an O&M team go straight to the likely culprits instead of checking a whole row panel by panel. Damage reports do the same job for anything broken on the way in.

Torque recordTABLECLAMPSTORQUECHECKED
Illustration: a torque record, table by table — not a specific site.
  1. For the asset owner

    Evidence the build matched its specification.

  2. For O&M

    A starting point when a fault turns up.

  3. For warranty questions

    A record that modules were fixed the way their maker requires.

Working with us

One contractor, directly employed teams.

  • Self-delivered labour

    Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.

  • Access in-house

    Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.

  • Documented to audit standard

    RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.

  • Mobilise quickly

    Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.

How a package runs

Tender pack to energisation.

Take one package or the lot — self-delivered, and documented as the work proceeds.

  1. 01
    Enquiry

    Tell us about the scheme

    We price the packages you need against your programme and scope.

  2. 02
    Week one

    Mobilise

    Welfare, compounds, access and inductions set up so the site works from week one.

  3. 03
    As we go

    Deliver & document

    Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.

  4. 04
    Handover

    Energise & hand over

    Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.

Interfaces and weather

Finished tables, handed to the DC team.

Mechanical installation works alongside civils — access, cable routes and station bases — and hands finished tables to the DC team to wire. The survey control that places the piles can also set out cable routes and station positions, so every package works from one set of drawings.

Weather sets the pace. A module catches the wind like a sail, so module lifts wait for calmer spells while other work carries on where it safely can, and wet ground limits where plant can travel without churning up the field. Phased programmes plan for both rather than forcing work through.

  1. Before

    Access, compound and laydown in place.

  2. Alongside

    Cable routes and station bases set out to the same drawings.

  3. After

    Tables ready for string wiring.

  4. At handover

    Torque records and damage reports for the asset owner.

References

Site references and method statements, on request.

We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.

FAQs

Mechanical installation: your questions.

Straight answers from the team who quotes and installs.

All FAQs

Email a tender pack, drawings or programme

Email the team

Yes. We deliver full or partial scope on ground-mount schemes, so mechanical installation can be taken on its own by a developer, EPC or principal contractor.

Yes — both structure types are part of the package, from pile setting-out through table build to module install with torque records.

They’re written up when found. Damage and breakage reporting is part of the mechanical package, so the asset owner has a record of any broken modules or parts rather than a surprise later.

Torque records for module install, damage and breakage reports and, where the scheme calls for traceability, a record of which modules went where.

Ready when you are

Ready to go 100% renewable?

Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.

Office hours
Mon–Fri, 8am–6pm
Head office
Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ

Solar farm packages, nationwide from Weston-super-Mare

  1. 1Your site
  2. 2About the project
  3. 3Your details

Tender enquiry

Tell us about the scheme and the packages you need. Take one package or the lot.

Enter your postcode.

Packages

Choose one option.

About the project

A little more detail helps us design the right system first time.

Roof or site type
When are you looking to install?

Your details

Last step — then we’ll be in touch.

Enter your name.

Enter a phone number.

Enter a valid email address.

Thanks, we’ve received your details.

Our team replies within 24 hours to discuss the scheme.