Solar farms · Mechanical installation
Mechanical installation for ground-mount solar farms.
Pile setting-out, tracker and fixed-tilt table build, and module mounting to torque and traceability requirements.
- Piles positioned from survey control
- Set-out
- Fixed-tilt or tracker
- Tables
- Recorded as modules go on
- Torque
- Modules and parts logged as found
- Broken
What’s included
From setting-out to the last module clamp.
Everything between a set-out field and finished tables, in the order the work has to happen — ready for the DC team to wire.
-
Setting-out & survey control
Pile and table positions set out from the site’s survey control, so rows land where the layout and cable drawings expect them.
-
Fixed-tilt and tracker structures
Fixed-tilt tables hold modules at one angle; trackers turn them east to west to follow the sun. Either is assembled to the structure supplier’s drawings.
-
Module install with torque records
Each module fixed down and its fixings tightened to the specified torque, with the value written down at the time.
-
Damage and breakage reporting
Broken or damaged modules and parts written up when they’re found, so the record shows what was damaged and where.
-
Traceability requirements
Where a scheme asks for it, the record shows which modules went where — so a later fault can be traced to the modules involved.
The build sequence
Setting-out, structures, then modules.
Mechanical installation runs in a fixed order because each step sets up the next. Piles are set out, structures go up on them and modules go on last. A pile out of position pulls its table out of line, and that error surfaces again when modules are clamped and strings are wired — so it is cheapest to catch before the structure goes up.
-
Mark out
Pile positions pegged before any structure arrives.
-
Build
Tables or tracker rows assembled on the piles.
-
Mount
Modules lifted on and fixed down, table by table.
-
Hand over
Finished tables passed on for string wiring.
Full or partial scope
Where this package sits on a solar farm build.
Take one package or the lot — every package is self-delivered by directly employed teams.
- Solar farm Site mobilisation Welfare, compounds, access and inductions
- Solar farm Trenching & civils Cable routes, ducting and station bases
- Solar farm Mechanical installation Setting-out, structures and module install
- Solar farm DC installation String wiring, combiners and terminations
- Solar farm LV / MV works Inverter stations, MV cables and jointing
- Solar farm Testing & commissioning Energisation testing with an evidence pack
- Solar farm O&M Preventative maintenance and reporting
Why the records matter
Records that outlast the build.
A clamp left loose can work free over the years; one that’s over-tightened can distort a module frame. Neither is easy to spot once rows are full of modules, which is why the torque record matters: it is the evidence the array went together as specified, still available long after the crews have gone.
Traceability works the same way. If a string underperforms years into operation, a record of which modules went where lets an O&M team go straight to the likely culprits instead of checking a whole row panel by panel. Damage reports do the same job for anything broken on the way in.
-
For the asset owner
Evidence the build matched its specification.
-
For O&M
A starting point when a fault turns up.
-
For warranty questions
A record that modules were fixed the way their maker requires.
Working with us
One contractor, directly employed teams.
-
Self-delivered labour
Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.
-
Access in-house
Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.
-
Documented to audit standard
RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.
-
Mobilise quickly
Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.
How a package runs
Tender pack to energisation.
Take one package or the lot — self-delivered, and documented as the work proceeds.
- 01 Enquiry
Tell us about the scheme
We price the packages you need against your programme and scope.
- 02 Week one
Mobilise
Welfare, compounds, access and inductions set up so the site works from week one.
- 03 As we go
Deliver & document
Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.
- 04 Handover
Energise & hand over
Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.
Interfaces and weather
Finished tables, handed to the DC team.
Mechanical installation works alongside civils — access, cable routes and station bases — and hands finished tables to the DC team to wire. The survey control that places the piles can also set out cable routes and station positions, so every package works from one set of drawings.
Weather sets the pace. A module catches the wind like a sail, so module lifts wait for calmer spells while other work carries on where it safely can, and wet ground limits where plant can travel without churning up the field. Phased programmes plan for both rather than forcing work through.
-
Before
Access, compound and laydown in place.
-
Alongside
Cable routes and station bases set out to the same drawings.
-
After
Tables ready for string wiring.
-
At handover
Torque records and damage reports for the asset owner.
References
Site references and method statements, on request.
We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.
FAQs
Mechanical installation: your questions.
Straight answers from the team who quotes and installs.
All FAQsEmail a tender pack, drawings or programme
Email the teamYes. We deliver full or partial scope on ground-mount schemes, so mechanical installation can be taken on its own by a developer, EPC or principal contractor.
Yes — both structure types are part of the package, from pile setting-out through table build to module install with torque records.
They’re written up when found. Damage and breakage reporting is part of the mechanical package, so the asset owner has a record of any broken modules or parts rather than a surprise later.
Torque records for module install, damage and breakage reports and, where the scheme calls for traceability, a record of which modules went where.
Ready when you are
Ready to go 100% renewable?
Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.
- Office hours
- Mon–Fri, 8am–6pm
- Head office
- Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ
- +44 7301 468735
Solar farm packages, nationwide from Weston-super-Mare
- 1Your site
- 2About the project
- 3Your details