Solar farms · Testing & commissioning

Solar farm testing and commissioning, fully evidenced.

Structured pre-energisation and energisation testing with a full evidence pack for the asset owner.

Compound Point of connection
Illustration: a ground-mount solar farm layout with the test points at each inverter station highlighted — not a specific site.
String curves and thermal surveys
IV-curve
Monitoring checked against the build
SCADA
Manuals handed over at energisation
O&M
Pre-energisation, then energisation
Two stages

What’s included

What gets tested, and what gets handed over.

Testing runs in two stages — before anything is live, then at energisation — and every result goes into the file the asset owner keeps.

  • Insulation, polarity & continuity

    The safety checks done before anything is live: cable and connector insulation, positive and negative the right way round, and a complete earthing path.

  • IV-curve and thermal surveys

    Each string’s current traced against its voltage, and the array surveyed with a thermal camera for anything running hot.

  • SCADA & monitoring verification

    Each inverter, meter and sensor checked for reporting to the right place in the monitoring platform.

  • Witnessed energisation & O&M manuals

    Energisation done with witnesses present and recorded, and O&M manuals handed over at the same time.

  • Evidence pack

    One place for everything the plant needs from its first day of operation.

What an IV-curve shows

Not just that a string is down, but why.

An IV-curve survey shows far more than a single reading. It traces how each string’s current changes with its voltage and compares the result with the curve the string should give for the sunlight and temperature at the time — so a string that is underperforming shows not just that something is wrong, but what kind of fault to look for.

A step: part of the string held backVOLTAGE →CURRENT →Expected for the conditionsMeasuredA string’s measured curve against the curve it should give for the sunlight at the time
Illustration: a measured IV-curve against the expected curve — not a specific site.
  1. Shading

    A step where part of the string is shaded.

  2. Soiling

    Current lower across the whole curve.

  3. Cracked cells

    Notches where damaged cells drag the string down.

  4. Poor connections

    A rounded shoulder from extra resistance.

Pre-energisation to energisation

Why some tests wait for the sun.

Safety tests come first because they have to pass before anything is connected: insulation, polarity and continuity are checked while the installation is still dead. Energisation follows, witnessed and recorded. The performance tests wait until the plant is generating in good sun, so a phased schedule leaves room for the weather.

  1. Before anything is live

    Insulation, polarity and continuity.

  2. At energisation

    Witnessed and recorded.

  3. In good sun

    IV-curve and thermal surveys.

  4. Alongside

    SCADA and monitoring checked against what was installed.

Working with us

One contractor, directly employed teams.

  • Self-delivered labour

    Directly employed mechanical and electrical teams — no chain of subcontractors between you and the work.

  • Access in-house

    Scaffold and access delivered by our sister company 100% Access Ltd, coordinated with the programme.

  • Documented to audit standard

    RAMS, ITPs, torque and test records issued as the work proceeds, not chased at handover.

  • Mobilise quickly

    Welfare, plant and crews mobilised to programme, including phased and weather-affected schedules.

How a package runs

Tender pack to energisation.

Take one package or the lot — self-delivered, and documented as the work proceeds.

  1. 01
    Enquiry

    Tell us about the scheme

    We price the packages you need against your programme and scope.

  2. 02
    Week one

    Mobilise

    Welfare, compounds, access and inductions set up so the site works from week one.

  3. 03
    As we go

    Deliver & document

    Mechanical, electrical and civils packages delivered to your programme, with records kept as each one completes.

  4. 04
    Handover

    Energise & hand over

    Witnessed energisation, a full evidence pack and O&M manuals for the asset owner.

The evidence pack

What the asset owner receives.

The pack is what the asset owner operates from: test results for every string and circuit, commissioning and energisation records and O&M manuals, alongside the drawings and datasheets for the equipment that went in. SCADA and monitoring checks sit in the same pack, so the first performance reports rest on a monitoring system proved against the plant as built.

Handover packDOCUMENTSCOPEISSUEDSIGNED
Illustration: the evidence pack index — not a specific site.
  1. Results

    Every test, string by string.

  2. Records

    Commissioning and witnessed energisation.

  3. Manuals

    O&M manuals for the equipment installed.

  4. Drawings

    Layouts and datasheets for what went in.

References

Site references and method statements, on request.

We’ll share site references, method statements and package-specific evidence on request — tell us the scheme and the packages you need.

FAQs

Testing & commissioning: your questions.

Straight answers from the team who quotes and installs.

All FAQs

Email a tender pack, drawings or programme

Email the team

Yes. Testing and commissioning can be taken on its own by a developer, EPC or principal contractor, whether or not we delivered the packages before it.

Because faults only show up as heat when current is flowing. Thermal surveys need the plant generating in good sun, so they are scheduled for suitable weather once the plant is running.

Energisation is witnessed and recorded. The asset owner’s team can witness it alongside us, and the network operator where the connection requires it.

Ready when you are

Ready to go 100% renewable?

Need solar farm testing and commissioning? Share the scheme, its location and programme — we’ll come back on resourcing and price for the packages involved.

Office hours
Mon–Fri, 8am–6pm
Head office
Unit 2, Ebdon Bow, Ebdon Road, Weston-super-Mare, BS22 9NZ

Solar farm packages, nationwide from Weston-super-Mare

  1. 1Your site
  2. 2About the project
  3. 3Your details

Tender enquiry

Tell us about the scheme and the packages you need. Take one package or the lot.

Enter your postcode.

Packages

Choose one option.

About the project

A little more detail helps us design the right system first time.

Roof or site type
When are you looking to install?

Your details

Last step — then we’ll be in touch.

Enter your name.

Enter a phone number.

Enter a valid email address.

Thanks, we’ve received your details.

Our team replies within 24 hours to discuss the scheme.